Mondium Mt Cattlin Yield Optimisation Project
Galaxy - Ravensthorpe, Western Australia
Project Execution Period
June 2018 – December 2018
Contract Value
$22 million
Project Description
Mondium is a joint venture between Monadelphous and Lycopodium, which delivers engineering, procurement and construction (EPC) services in the minerals processing sector.
The Mt Cattlin Yield Optimisation project included the design and construction of four new process modules to increase yield optimisation of the plant.
Scope of Work
An EPC contract for the design, engineering, construction and commissioning of the following circuits within an operating plant environment:
- Fines recovery circuit including wet high-intensity magnetic separation (WHIMS)
- Secondary floats re-liberation circuit
- Optical sorting circuit
- Process water upgrade
- Miscellaneous brownfield plant modifications/upgrades